NEW QUESTION # 15
Which steps are available for the maintenance technician when using the Report Malfunction tile? Note: There are 3 correct answersto this question.

  • A. Add a URL to provide further information.
  • B. View details of the technical object by navigating to the Asset Viewer.
  • C. Display the current location of the technical object.
  • D. Input estimated costs for repair malfunction.
  • E. Select and print the maintenance order shop papers.

Answer: A,B,C


NEW QUESTION # 16
You want to set up a general maintenance task list for inspectionrounds using the overall time confirmation as a simplified way torecord measurement documents. What do you need to do? Note: There are 2 correct answers to this question.

  • A. Assign an inspection document as PRT to the task list operation.
  • B. Assign a measuring point as a production resources/tools(PRT) to a task list operation.
  • C. Assign a piece of equipment with an allocated measuring point to a task list operation.
  • D. Assign an inspection lot to the task list header.

Answer: B,C


NEW QUESTION # 17
Which of the following BOMs we use to set up spare parts planning of functional locations

  • A. Costing BOM
  • B. construction BOM
  • C. Production BOM
  • D. Maintenance BOM

Answer: D


NEW QUESTION # 18
You want to have several plan dates calculated in a maintenance plan. Which scheduling parameter do you use?

  • A. Scheduling indicator
  • B. Call horizon
  • C. Lead float
  • D. Scheduling period

Answer: D


NEW QUESTION # 19
You cancel the technical completion of a work order. What are theeffects? Note: There are 2 correct answers to this question.

  • A. Referenced notifications are put In Process again.
  • B. Open purchase orders are recompiled.
  • C. Open purchase requisitions are recompiled
  • D. Open reservations are recompiled.

Answer: C,D


NEW QUESTION # 20
You have created a new equipment category, "linear", with the corresponding view profile. Which fields appear in the equipment linear data tab? Note: There are 3 correct answers to this question.

  • A. Object network
  • B. Type of offset
  • C. Segment
  • D. Start marker
  • E. Unit of measure

Answer: B,D,E


NEW QUESTION # 21
You want to create a maintenance order with an external order operation with service items. Which of the following statements arecorrect? Note: There are 3 correct answers to this question.

  • A. The usage of a model service specification is mandatory.
  • B. The assignment of a control key with the service indicator set is mandatory.
  • C. The actual value entry can only be recorded via the service entrysheet.
  • D. The assignment of service master records to an order operation is optional.
  • E. The assignment of a control key with the service indicator set is mandatory.

Answer: B,C,E


NEW QUESTION # 22
You want to display vehicle-specific data for a piece of equipment. How do you proceed?

  • A. Define the field selection for the vehicle equipment master data.
  • B. Assign a view profile to the combination of fleet object type and equipment category.
  • C. Assign a view profile to the combination of fleet object type and usage type.
  • D. Assign a view profile to an equipment category for fleet equipment.

Answer: B


NEW QUESTION # 23
Which statements about the structure indicator are correct? Note:There are 2 correct answers to this question.

  • A. It can have a maximum length of 50 characters.
  • B. It defines which data is transferred to the lower levels of the hierarchy.
  • C. It defines the allowed characters for a functional location.
  • D. It defines hierarchy levels of the functional location structure.

Answer: C,D


NEW QUESTION # 24
You want to see historical information relating to the phases when equipment was installed at a functional location. Where can you find this information?

  • A. Usage list
  • B. Historical Orders list
  • C. Structure Display
  • D. Location Analysis list

Answer: A


NEW QUESTION # 25
Which scheduling parameters are used in a multiple-counter plan? Note: There are 2 correct answers to this question.

  • A. Scheduling indicator
  • B. Factory calendar
  • C. Start date
  • D. Scheduling period

Answer: C,D


NEW QUESTION # 26
The planner adds non-stock material in a released maintenance order. Which of the following statements regarding the purchasing process are correct? Note: There are 3 correct answers to this question.

  • A. A purchase order is created automatically as soon as the order is saved.
  • B. A goods receipt can ONLY be posted for a maintenance order with status REL.
  • C. The maintenance order can be set to TECO before the invoice is created.
  • D. A goods receipt can be posted after the maintenance order is technically completed
  • E. A purchase requisition can be created automatically as soon asthe the order is saved.

Answer: C,D,E


NEW QUESTION # 27
Which statement is correct when planning maintenance work thatis to be carried out by an external company?

  • A. If you assign a control key with indicator "Service" for an external service, you have to enter the actual values via the service entry sheet.
  • B. In the control key assigned to the order operation, the "Service" indicator must always be activated.
  • C. If you assign a control key for an external order operation, theactual values must always be entered as a goods receipt in the system.
  • D. A service master record must always be assigned to the external order operation.

Answer: A


NEW QUESTION # 28
Where can you see the results of the material availability check for maintenance orders? Note: There are 2 correct answers to this question.

  • A. In the material reservation list in inventory management
  • B. Within a maintenance order
  • C. In the single-level list editing function for maintenance orders
  • D. In the report Material: Where-Used List

Answer: B,D


NEW QUESTION # 29
You want to create a single cycle plan with a cycle of 12 months. You use the Time - key date scheduling indicator. The orders should be called 3 months before the planned date. How can you setup the maintenance plan? Note: There are 2 correct answers to this question.

  • A. Set the offset to 3 months.
  • B. Set the call horizon to 25%.
  • C. Set the call horizon to 75%.
  • D. Set the call horizon to 90 days.

Answer: A,B


NEW QUESTION # 30
The first release of SAP asset manager mobile application is based on

  • A. Windows only
  • B. ios only
  • C. Android only
  • D. ios and android
  • E. IOS,Android, Windows

Answer: B


NEW QUESTION # 31
How does a performance-based maintenance plan calculate the interval between start date and planned date?

  • A. Cycle length divided by monthly performance
  • B. Cycle length divided by annual performance
  • C. Cycle length divided by ((scheduling period) x (cycle modification factor))
  • D. Cycle length divided by (annual performance / 365)

Answer: D


NEW QUESTION # 32
Which activities can the technician perform with the Repair Malfunction SAPUI5 app? Note: There are 2 correct answers to thisquestion.

  • A. Release. Start Work
  • B. Put in Process.
    Schedule
  • C. Complete. Close Report
  • D. Release. Print

Answer: A,C


NEW QUESTION # 33
Which of the following statements are correct for SAP S/4HANACIoud - Asset Management? Note: There are 2 correct answers to this question.

  • A. You have access to the SAP S/4HANA back end system.
  • B. You can configure SAP S/4HANA Cloud via the SAP Asset Intelligence Network.
  • C. You can configure SAP S/4HANA Cloud via the self-service configuration UI.
  • D. You do NOT have access to the SAP S/4HANA back end system.

Answer: C,D


NEW QUESTION # 34
You want to create a new functional location. Which configurationsteps are required? Note: There are 2 correct answers to this question.

  • A. Define the structure indicator.
  • B. Define the functional location category.
  • C. Define the reference functional location.
  • D. Define the number range for the functional location category.

Answer: A,B


NEW QUESTION # 35
Which of the following can you assign to an equipment category via a view profile? Note: There are 2 correct answers to this question.

  • A. Manufacturer data
  • B. Serial data
  • C. Configuration
  • D. Warranty

Answer: B,C


NEW QUESTION # 36
Which of the following statements about orders with operation account assignment (OAA) are correct? Note: There are 3 correct answers to this question.

  • A. A technical object must be assigned to an order operation.
  • B. Costs are only stored for the operation object.
  • C. Purchase requisitions have the operation as account assignment.
  • D. Overall costs are dynamically summed up on header level.
  • E. The settlement rule is maintained on header level.

Answer: A,B,D


NEW QUESTION # 37
Which parameter in a maintenance strategy do you use to set thestart/end date of the maintenance order?

  • A. Initial/subsequent buffer
  • B. Package offset
  • C. Call horizon
  • D. Package hierarchy

Answer: A


NEW QUESTION # 38
Which of the following parameters are available when you define a new maintenance plan category? Note: There are 3 correct answers to this question.

  • A. Call object
  • B. Completion date
  • C. Change documents
  • D. Order type
  • E. Maintenance activity type

Answer: A,B,D