Real EMC D-NWG-DS-00 Exam Questions [Updated 2025]
D-NWG-DS-00 Exam Dumps Pass with Updated 2025 Dell Networking Design
NEW QUESTION # 44
Which activity is the responsibility of the customer in the network replacement process?
Response:
- A. Create a validation plan.
- B. Create a detailed replacement plan.
- C. Create a deployment verification report.
- D. Create a detailed replacement plan.
Answer: A
NEW QUESTION # 45
What is the main benefit of utilizing the EPS tool in a networking design project?
Response:
- A. It calculates the power and environmental needs for the network equipment
- B. It provides real-time network traffic analytics
- C. It helps automate the network configuration process
- D. It schedules daily network backups
Answer: A
NEW QUESTION # 46
Which tool is typically used during the scoping phase to identify and prioritize networking project requirements?
Response:
- A. FastList
- B. Unisphere
- C. Control Station
- D. PowerSwitch
Answer: A
NEW QUESTION # 47
Which of the following are key elements in Layer 3 (L3) network planning?
Response:
- A. IP addressing
- B. Subnetting
- C. Routing protocols
- D. MAC address table management
Answer: A,B,C
NEW QUESTION # 48
A delivery engineer is deploying a pair of Dell PowerSwitch S5232F-ON switches for a VxRail deployment. What is the correct order of steps for configuring the switches?
Response:
- A. Connect to OS10 Web UI.
- B. Connect to OS10 Web UI.
- C. Connect to OS10 Web UI.
- D. Connect to OS10 Web UI.
Answer: C
NEW QUESTION # 49
Which of the following are responsibilities of a network design professional?
Response:
- A. Identifying business requirements
- B. Writing software code
- C. Providing disaster recovery options
- D. Developing a security architecture
Answer: A,C,D
NEW QUESTION # 50
What are two requirements when configuring DCB iSCSI?
Response:
- A. The Design Architect should work with the Storage Architect to verify compatibility with the planned storage arrays.
- B. DCB iSCSI VLAN must be configured as untagged.
- C. iSCSI HBA NPAR must be configuration while configuring DCB iSCSI.
- D. Switches must be configured for treating dot1p priority 4 as lossless.
- E. DCB iSCSI must be configured for all Dell storage arrays connecting to Dell OS10 switch.
Answer: A,D
NEW QUESTION # 51
What is the primary purpose of the scoping phase in a networking design project?
Response:
- A. To define the project scope, deliverables, and requirements
- B. To install network hardware
- C. To configure network switches and routers
- D. To provide network monitoring solutions
Answer: A
NEW QUESTION # 52
Which tool is typically used to support network deployment by providing detailed setup instructions?
Response:
- A. CloudIQ
- B. Solve Online
- C. PowerMax Manager
- D. FastScript
Answer: B
NEW QUESTION # 53
Which of the following steps should be taken when modifying a network design template for a specific project?
Response:
- A. Reuse the template from a previous project without changes
- B. Use a generic template without customization
- C. Add all devices to a single VLAN
- D. Customize the template to reflect the unique requirements of the current project
Answer: D
NEW QUESTION # 54
Which of the following are key considerations during Layer 3 (L3) network planning?
Response:
- A. VLAN segmentation
- B. Routing protocols
- C. Network topology
- D. IP address allocation
Answer: B,C,D
NEW QUESTION # 55
What type of information is typically included in a Pre-Deployment Configuration Template?
Response:
- A. IP addressing, device configurations, and security policies
- B. Network topology design
- C. Network traffic patterns
- D. Device firmware versions
Answer: A
NEW QUESTION # 56
What is the primary role of scripting tools like FastScript in network design projects?
Response:
- A. To perform network vulnerability assessments
- B. To automate network device configuration and reduce manual errors
- C. To document network changes
- D. To track network performance metrics
Answer: B
NEW QUESTION # 57
A network engineer is designing a leaf-spine architecture based on Dell PowerSwitches. Which three best practices should be considered in this scenario when implementing BGP?
Response:
- A. Use one different ASN for each spine.
- B. Use eBGP between the leaf and spine.
- C. Use iBGP between the leaf and spine.
- D. Use one ASN per each leaf pair.
- E. Use the same ASN for each spine.
Answer: A,B,D
NEW QUESTION # 58
A customer is planning for a Cyber Recovery vault. They want the vault to have the strongest level of protection from external connections. The vault must be able to send out SMTP data out. What device should be connected on the edge of the vault?
Response:
- A. Air gap
- B. Router
- C. Firewall
- D. Data Diode
Answer: D
NEW QUESTION # 59
Which planning process is focused on ensuring the availability of licenses for networking devices?
Response:
- A. VLAN configuration
- B. Layer 2 (L2) planning
- C. VxRail SFS planning
- D. OS10 Licensing
Answer: D
NEW QUESTION # 60
The scoping phase is primarily focused on defining __________, deliverables, and requirements to ensure alignment with business goals.
Response:
- A. Hardware specifications
- B. Project scope
- C. Performance metrics
- D. Network configurations
Answer: B
NEW QUESTION # 61
What are three of the phases of an Enterprise Project Services project?
Response:
- A. Approval
- B. Design
- C. Scoping
- D. Close
Answer: B,C
NEW QUESTION # 62
......
D-NWG-DS-00 Exam Dumps, D-NWG-DS-00 Practice Test Questions: https://examcollection.bootcamppdf.com/D-NWG-DS-00-exam-actual-tests.html